Where each post meets the ground
Cedar holds up outdoors better than most lumber because it resists rot and insects. That resistance has limits. A cedar post buried in soil or set flat on a slab, where water pools around its base after every storm, softens from the bottom up, and the first sign is often a post that has started to lean.
We keep every post off the ground and off the concrete. Each one stands on a footing poured below the frost line, so the freeze and thaw that lift shallow footings each winter cannot push the pavilion out of square. On top of the footing goes a metal post base or a stone pier that holds the end grain up out of standing water and lets it dry. Cut ends get sealed before they go up, because end grain drinks water far faster than the face of a board.
Footing layout also sets the shape of the building. Post spacing decides how wide the open span can be, how big the beams must get, and how the seating and fireplace fit between them. We settle that on paper first, with a licensed architect drawing the frame up from your sketch, so the footings land where the structure needs them and not where the digging happened to be easiest. If you have a pavilion that is already leaning or leaking at the posts, describe it to us here and we will come look at the base.

Trusses, beams and a wet Ohio snow
The roof is the heavy part of a pavilion. Its trusses and beams carry the roofing itself, the snow that piles up in a hard winter, and the wind that pushes on an open structure from every side. A building with no walls has nothing bracing it except its own frame, so the connections matter as much as the size of the timbers.
We size the beams and trusses for the open span you want and for Ohio snow, then join them with bolted connections and knee braces that keep the frame from racking in the wind. Exposed trusses are what people look up at, so they are cut and finished to be seen. Generous timbers make a pavilion feel solid. Timbers that are only just enough look thin, even when they pass.
Shingle or metal overhead
Either roof works. Shingles match many houses and soften the sound of rain. Standing seam metal sheds snow quickly and suits a pavilion with a simple pitch. Whichever you choose, the roof gets flashed so water cannot find its way into the beam pockets, the fireplace chase or the joint where the pavilion meets a wall of the house, and the gutters carry it clear of the posts and the paving below. We usually match what is already on the house unless the pavilion has a reason to stand apart.
Footings to the first fire
Walk the yard
We look at sun, slope, the pool or patio nearby and the windows behind it, then mark where the pavilion and its fireplace would sit best.
Draw the frame
Your sketch becomes a set of drawings showing post spacing, truss and beam sizes, the roof, the chimney and every light, fan and outlet.
Footings, posts and roof
Our own crew pours the footings, sets the bases and piers, raises the frame and roofs it, with Samuel on site through the build.
Stone, wire and ceiling
The fireplace and piers are laid up, wiring runs inside the frame, the ceiling boards close it in, and we walk the finished pavilion with you.
A fireplace under a timber roof
A stone fireplace turns a pavilion into a room you can use on a cold evening, and it changes the engineering. The firebox and chimney are masonry carrying their own weight, so they sit on a footing of their own, sized for the stone above it and set below frost like the posts.
The chimney has to rise far enough above the roof to draw well and to keep sparks off the shingles or panels around it. Every piece of wood near the firebox, from the beams down to the ceiling boards, keeps the clearance the fireplace requires, and the flashing where the chimney passes through the roof gets the same attention we would give a chimney on the house. Stone piers at the posts can use the same stone as the fireplace, which ties the two together visually.
A fireplace under wood gets planned around the fire first and the looks second.
Power before the ceiling closes
Lights, ceiling fans, outlets for a heater and a television mounted over the mantel all need wire, and the easy time to run it is before the ceiling boards go on. Every fixture and outlet goes on the drawings, so the wiring runs inside the frame instead of along it. Adding a fan after the fact usually means pulling boards down or living with conduit you can see from every chair.
Placing it so the shade falls where you want it
Where a pavilion sits decides how the whole yard works. At the far end of a pool or a patio it gives the eye somewhere to land and gives people a reason to walk the length of the space. Too close to the house, it can darken the windows behind it. Too close to the water, it can shade the part of the pool you wanted warm.
We walk the yard with you and watch where the sun falls through the afternoon, where people will come from, and where the patio or path will meet the pavilion floor. That floor should sit slightly above the surface around it and pitch so rain blowing in under the eaves runs out instead of collecting at the posts. Paving that continues under the roof is laid on the same base as the patio outside, so the two never settle apart. If the patio is still to be built, our patio construction page explains how we plan the two together, and our Oakwood page has more about what else we build in town.
How cedar ages
Left alone, cedar weathers to a soft silver. A clear or tinted sealer keeps more of the warm color, with a fresh coat now and then. Either is a fair choice as long as the end grain stays sealed and the wood sheds water. Finished pavilions are in our gallery, and our cedar pavilions page covers what we build for owners throughout the region. To talk about your yard and what a build like that runs, the number is (937) 818-6177, or you can reach out to us.
More work in Oakwood
Where Oakwood sits
What people ask about building a pavilion
How do you keep cedar posts from rotting?
Keep them dry at the bottom. Every post stands on a footing below frost with a metal base or a stone pier that lifts the end grain clear of standing water. Cut ends are sealed before the post goes up. Most failed posts we see were set in soil or flat on concrete.
Can a pavilion handle heavy snow?
Yes, when the trusses and beams are sized for it. We size the frame for the open span and for Ohio snow, and brace it so wind cannot rack it. Undersized timbers are a common reason older pavilions sag at the middle of the ridge or the main beam.
Can you build a fireplace inside a pavilion?
Yes. The fireplace and chimney sit on their own footing, and all the wood around them keeps the clearance the fireplace requires. The chimney rises far enough above the roof to draw properly, and the roof is flashed around it so that joint stays dry through every season.
Should the pavilion roof be shingle or metal?
Either works. Shingles often match the house and soften the sound of rain. Standing seam metal sheds snow fast and fits simpler roof shapes. We usually follow what is on the house unless there is a reason not to, and either roof gets flashed with the same care.
When should lighting and fans be planned?
Before the ceiling boards go up. We put every light, fan, outlet and television location on the drawings, so the wire runs inside the frame and the fixtures land where the seating and fireplace need them. Adding them afterward means opening the ceiling or running visible conduit.
Does the cedar need to be stained or sealed?
That part is your choice. Untreated cedar weathers to silver and still holds up well if it stays off the ground and sheds water. A sealer keeps more of the original warmth but needs recoating over time. Either way, we seal the cut ends during the build.
Tell us where your evenings outside should happen
We will walk the yard with you and find the spot the pavilion belongs.