
Building in Cedarville
Cedarville sits close enough to our shop that we can be on site early and stay until the day’s work is actually finished.
With the yard in Gratis, reaching Cedarville is straightforward, which matters for scheduling and response. A crew that is not spending hours in a truck starts earlier and stays later, which shows up in the schedule.
We are a family business. The person who quotes your job is on the site while it is being built.
We do not have a local process and a distant one. Every build follows drawings, site work, structure and finish in that order.
If the timeline matters, say so early. Cedarville permitting has its own pace.

What building here involves
Around here the older houses generally have the better framing and the worse wiring. Newer houses invert that, and also tend to have layouts that look good on a plan and live poorly.
The weather swing here is wide enough that materials move noticeably. Detailing has to allow for that rather than assume a static building.
The weather swing here is wide enough that materials move noticeably.
We take care of the regulatory path, from submission through final inspection, on every project.
Nearby work gets better service, simply because the crew is not spending a quarter of its day in a truck.
What we build here

New Home Construction
Ground-up construction on your lot
Site prep, footers, foundation walls and framing through final trim, managed by one team.
Read more
Custom Home Design
Sketch to blueprint to build
We work with licensed architects to turn what you drew on paper into a build-ready set of plans.
Read more
Multi-Structure Estate Construction
Main house, shop, barn, guest quarters
Estates that need more than one building, sequenced so the site work happens once.
Read more
Whole Home Remodeling
Taking a house down to the studs
Full gut and rebuild for houses worth keeping, where the bones are good and everything else goes.
Read moreScope, schedule and staying in touch
The scope we issue is deliberately detailed: what we are doing, what we are not doing, what we suspect is behind the drywall, and the written process for any change. Vagueness early is expensive later.
We give you a real schedule, not an optimistic one: stage by stage, with the known risks named. Ohio weather, inspection queues and long-lead materials are the usual culprits.
We give you a real schedule, not an optimistic one: stage by stage, with the known risks named.
If something goes sideways we tell you that day. Waiting rarely makes a construction problem cheaper.
Final sign-off happens on site, with you, after we have fixed whatever the walkthrough turned up.
Where Cedarville sits
Greene County8 towns
Beavercreek through Xenia, a mix of newer subdivisions and older farm properties.
Building in Greene CountyThe person who walks your property is on site while it is being built.Samuel Hand
What we put in writing
Metal roofing here is warranted forty years and shingle roofing thirty. Warranty coverage is a product of installation quality as much as material choice.
Labor is warranted by us. Problems traceable to our installation get corrected at our cost.
Cedarville questions
Are you licensed and insured?
Yes. We carry the coverage required for residential construction in Ohio and can provide certificates before work begins.
What warranty comes with a standing seam metal roof?
The standing seam metal we install carries a forty-year warranty. Dimensional shingles carry a thirty-year warranty.
Who is actually on site during my build?
Our own crew handles the core work. Samuel is on site through the build, not just at the start and the end.
How do you handle changes once we have started?
Changes get written down, priced and approved before they happen. Nothing gets built off a hallway conversation.
Can you remodel an older home, or only build new?
Both. A good share of our work is remodeling houses that were built well and are worth keeping.
Do you give a written scope before work starts?
Always. It states what is included, what is excluded, what we expect to find once things are opened up, and how a change gets priced and approved. A one-page quote is how disputes start.
Who pulls the permits?
We do, and we deal with inspection scheduling as part of the job. You are not calling a building department.
Building in Cedarville?
Every Cedarville project starts the same way: understand the house, then draw it, then build it.