Truth, trust and transparency.
Samuel Hand, founderWhat goes into granite countertops
Granite is a natural stone, so no two slabs are the same. We recommend seeing the actual slab before it is cut, and deciding together where the seams and the strongest veining will fall.
Templating happens after the cabinets are installed and level, so the stone is cut to the cabinets that are there, not to the drawings. Overhangs longer than the stone can carry on its own get steel supports or corbels.
Templating happens after the cabinets are installed and level, so the stone is cut to the cabinets that are there, not to the drawings.
Sink cutouts, faucet holes and edge profiles are settled before fabrication. Granite needs a sealer, and we will tell you how often for the stone you choose.
Backsplashes and full-height slabs are an option with granite, and they look best when the veining runs continuously from the counter up the wall. That takes careful layout at the fabrication stage, which is another reason we want the slab chosen and approved before anyone cuts it.
Other clients are buying a house that needs work and want to know what they are getting into before closing. A walkthrough with a builder can turn a vague worry into a list of real priorities and a realistic order to tackle them.
Timing matters more than most people expect. Selections like cabinets, windows, stone and specialty doors can take weeks to arrive. Making those choices early keeps the crew working instead of waiting on a delivery.
Insulation and air sealing are easiest to improve when walls or attics are open. During a remodel or addition, that is the moment to bring the house up to a better standard, because the cost later is much higher.
If that sounds like the way you would want the work done, the next step is a conversation and a walkthrough. We will look at what is there, talk through what you are trying to get to, and tell you honestly whether we are the right company for it.
There is no cost to that conversation and no obligation after it. We would rather spend an hour finding out a project is not a fit than take it on and do a mediocre job.
How this job runs
Walkthrough
We look at the property and the existing conditions before anything else.
Drawings
Plans and a written scope, so everyone is building the same thing.
Build
Our crew runs the work, with Samuel on site through it.
Walk it together
We close the job by walking it with you, not by sending a final bill.
What actually decides the outcome
Countertops are only as flat as the cabinets under them. Cabinets get set level and secured before anyone templates, because stone will not bend to hide a cabinet that is out of level.
Templating happens on site, after the cabinets are in, so the stone is cut to the room as built. Walls are never perfectly straight and the template captures that.
Templating happens on site, after the cabinets are in, so the stone is cut to the room as built.
Seams, overhangs and cutouts are decided before cutting. Where a seam lands, how far an island overhangs and whether it needs support are choices to make on paper, not on install day.
The rest of the kitchen has to be ready for the stone: sink and faucet chosen, appliances on site or specified, and backsplash plans settled, so the counters go in once.
Truth, trust and transparency. That is the standard, and it shows up in the schedule.Samuel Hand
Related work
Quartz counters with clean seams
Quartz Countertops
Quartz countertops templated from the finished cabinets, with seam placement and edge profile decided before fabrication.
Read more
Kitchen Remodeling
Kitchens built around the cook
Cabinet layout, stone, tile and lighting planned together instead of picked one at a time.
Read more
New Kitchen Construction
A new kitchen, planned from the plumbing out
Kitchens built new, in a new house or in a room taken back to the framing, with every system laid out for the room.
Read moreWhat we put in writing
The roof warranties are forty years for standing seam metal and thirty for dimensional shingles, and both assume the details were done correctly.
Beyond the manufacturer coverage we stand behind our own workmanship. If something we built is not right, we come back. That is easier to say than to honor, which is why we build fewer projects properly rather than more quickly.
Beyond the manufacturer coverage we stand behind our own workmanship.
The service area is Montgomery, Greene, Warren, Butler, Preble and Miami counties, a seventy-mile working radius that we can genuinely cover.
Practically that covers Dayton, Kettering, Centerville, Beavercreek, Springboro, Lebanon, Mason, Hamilton, Fairfield, West Chester, Troy, Piqua, Eaton and the towns between them. Near the edge of that, call and ask.
Granite Countertops questions
Can I pick my own granite slab?
We recommend it. Natural stone varies slab to slab, and seeing the slab lets you decide where the seams and veining go.
Does granite need sealing?
Most granite does. How often depends on the stone, and we will tell you for the slab you choose.
Can granite support an overhang?
Short overhangs, yes. Longer ones need steel supports or corbels, which we plan before the stone is cut.
Can you remodel an older home, or only build new?
Both. A good share of our work is remodeling houses that were built well and are worth keeping.
Do you give a written scope before work starts?
Always. It states what is included, what is excluded, what we expect to find once things are opened up, and how a change gets priced and approved. A one-page quote is how disputes start.
Who pulls the permits?
We do, and we deal with inspection scheduling as part of the job. You are not calling a building department.
What happens if you find something unexpected?
We stop, document it, price the options and talk to you before proceeding. On older houses that is a normal part of the process, not an emergency.
Do you use your own crew or subcontractors?
Our own crew handles the core work. Where a licensed specialty trade is required we bring in people we have worked with for years, and we manage them directly.
How do payments work?
Draw schedule tied to completed stages, agreed in writing before work starts. You are never paying substantially ahead of the work that has been done.
Can we live in the house during the work?
Often yes, depending on scope. We will tell you honestly when it is not realistic, and we plan containment and access around the answer.
Ready to talk about your project?
We build across Montgomery, Greene, Warren, Butler, Preble and Miami counties.