Start a conversation
Home About
Services Every service
Building Custom Home Builds Luxury Home Builds New Home Construction Custom Home Design Multi-Structure Estate Construction Custom Garages Shop Buildings
Remodeling Whole Home Remodeling Home Renovations Kitchen Remodeling New Kitchen Construction Bathroom Remodeling Custom Tile Bathrooms Home Additions Exterior Remodeling Home Theater Construction
Roofing Standing Seam Metal Roofing Installation Standing Seam Metal Roofing Replacement Dimensional Shingle Roofing
Outdoor Outdoor Living Spaces Outdoor Kitchen Construction Patio Construction Custom Composite Deck Construction Covered Decks Porch Construction Aluminum Railing Installation Custom Pergola Construction Cedar Pavilions Covered Bridges Residential Bridges
Water Custom Pool Construction Hot Tub Installation Water Features Custom Waterfalls
Sitework Retaining Walls Excavation Services Decorative Concrete Stamped Concrete Patios Stamped Concrete Sidewalks Concrete Driveways
Finishes Custom Tile Installation Tile Shower Installation Interior Stonework Stone Veneer Installation Granite Countertops Quartz Countertops Custom Carpentry Custom Woodworking Interior Painting Premium Exterior Painting
Areas Every area
Montgomery County Montgomery County Oakwood Miamisburg West Carrollton Trotwood Englewood Vandalia Clayton Germantown Brookville New Lebanon
Greene County Greene County Beavercreek Xenia Fairborn Bellbrook Yellow Springs Cedarville Jamestown Spring Valley
Warren County Warren County Springboro Lebanon Mason Franklin Monroe Waynesville Carlisle Maineville
Butler County Butler County Hamilton Fairfield West Chester Oxford Middletown Trenton Liberty Township
Preble County Preble County Eaton West Alexandria Lewisburg Gratis Camden West Manchester
Miami County Miami County Troy Piqua Tipp City West Milton Covington Pleasant Hill
Gallery Blog Contact Call · (937) 818-6177
Skip to content
New Lebanon, Ohio

New Lebanon's luxury contractor

We treat a New Lebanon job the same as any other: drawings first, then dirt, then framing, then finish.

A French-style stone manor with a paver motor court in New Lebanon
Local

Building in New Lebanon

We treat a New Lebanon job the same as any other: drawings first, then dirt, then framing, then finish.

We run out of Gratis, close enough to New Lebanon that it is regular territory rather than an occasional trip. A crew that is not spending hours in a truck starts earlier and stays later, which shows up in the schedule.

One team handles excavation, foundation, framing and finish, so nothing gets lost between trades.

The order of work is consistent: drawings, site, structure, finish. That does not vary from one town to the next.

Outdoor projects often start with a simple wish to use the yard more. That can mean a patio, a covered deck, a pavilion or a full outdoor kitchen. The useful question is how you want to spend an evening out there, because that decides the shape of the space.

Insurance work, storm damage and failing roofs bring in some of our calls. Those are usually urgent, and we treat them that way, but we still look at the whole picture so a repair does not leave a weaker spot next to it.

Call and we will talk through what building in New Lebanon actually involves.

Foyer coffered stair living space in a Hand Made Enterprises home
Conditions

What building here involves

The housing around here falls into a few groups and each asks for something different. Post-war homes on established streets usually have sound structure and dated systems. Newer subdivision houses often have the reverse: current mechanicals wrapped around builder-grade finishes and a layout that fights how people live.

The weather swing here is wide enough that materials move noticeably. Detailing has to allow for that rather than assume a static building.

The weather swing here is wide enough that materials move noticeably.

Submissions, revisions and inspection scheduling all sit with us. Local familiarity here is worth more than it sounds.

Being close matters more than people expect. A crew not spending two hours a day driving starts earlier, stays later, and can come back the same afternoon when something needs attention.

Concrete is strong, but it always cracks somewhere. Good base preparation, the right thickness, reinforcement and planned control joints decide where those cracks happen and how much they matter.

Ohio’s freeze-thaw cycles are hard on anything outdoors. Water gets into small cracks, freezes, expands and opens them wider. Concrete, masonry and decking all have to be detailed with that in mind, which mostly means good drainage and the right base underneath.

Services

What we build here

Dining barrel vault stone living space in a Hand Made Enterprises home

Whole Home Remodeling

Taking a house down to the studs

Full gut and rebuild for houses worth keeping, where the bones are good and everything else goes.

Read more
Stone arch curved stair interior of a custom home by Hand Made Enterprises

Home Theater Construction

Purpose-built rooms for watching

Framing, isolation, wiring chases and tiered seating built into the structure, not added after.

Read more
A pool with a raised spa and a flagstone patio beside a covered pavilion

Patio Construction

Patios laid on a base that lasts

The base under a patio decides whether it is still flat in ten years.

Read more
Hand Made Enterprises crew working on a finished detached garage

Decorative Concrete

Flatwork with a finish

Stamped, colored and broom-finished concrete poured over a base that will not move.

Read more
Freestanding tub chandelier bath in a Hand Made Enterprises build

Custom Tile Bathrooms

Bathrooms tiled floor to ceiling

Fully tiled bathrooms where the floor, the walls and the shower are laid out as one surface.

Read more
A timber-frame pavilion with an outdoor kitchen, grill and dining table on a stone patio

Outdoor Living Spaces

A second living room, outside

Patios, covered rooms, fireplaces and cooking areas laid out as one space that gets used from April to November.

Read more
How we run it

Scope, schedule and staying in touch

Before anything starts you get a written scope: inclusions, exclusions, the discoveries we anticipate, and the process for approving a change. Most disputes in this trade trace back to a quote that never said any of that.

You will know the build sequence and roughly how long each stage takes, along with an honest list of what might push it. Selections made late are the delay we see most often.

You will know the build sequence and roughly how long each stage takes, along with an honest list of what might push it.

The phone gets answered by someone who can actually speak to your job. That is the whole policy.

A job ends when the client agrees it has ended. That means a walkthrough, a written list of anything outstanding, and the work to clear it.

Budget is easier to manage when it is set against a real scope. We would rather help you decide what matters most, and spend there, than spread money thinly across everything. A strong envelope and good structure first, then the finishes you will touch every day.

Living in the house during the work is possible on many jobs and not on others. Kitchens, whole-floor remodels and anything involving the only bathroom are disruptive. We talk through containment, dust, access and timing so you can decide with real information.

Service area

Where New Lebanon sits

Montgomery County13 towns
The person who walks your property is on site while it is being built.
Samuel Hand
Warranty

What we put in writing

The metal roofing we install is warranted for forty years; the dimensional shingles for thirty. Those warranties assume correct installation, which is the part we control.

We cover our workmanship directly, and we keep the schedule light enough that honoring it is always possible.

Common questions

New Lebanon questions

What area do you cover?

We work a seventy-mile radius from Gratis, Ohio, which covers Montgomery, Greene, Warren, Butler, Preble and Miami counties.

Are you licensed and insured?

Yes. We carry the coverage required for residential construction in Ohio and can provide certificates before work begins.

What warranty comes with a standing seam metal roof?

The standing seam metal we install carries a forty-year warranty. Dimensional shingles carry a thirty-year warranty.

Who is actually on site during my build?

Our own crew handles the core work. Samuel is on site through the build, not just at the start and the end.

How do you handle changes once we have started?

Changes get written down, priced and approved before they happen. Nothing gets built off a hallway conversation.

Can you remodel an older home, or only build new?

Both. A good share of our work is remodeling houses that were built well and are worth keeping.

Do you give a written scope before work starts?

Always. It states what is included, what is excluded, what we expect to find once things are opened up, and how a change gets priced and approved. A one-page quote is how disputes start.

Building in New Lebanon?

We are happy to walk a New Lebanon property and tell you honestly what it needs.