Building in Gratis
A lot of Gratis homes were built well the first time. Those are worth remodeling rather than replacing.
Based in Gratis, we treat Gratis as home ground rather than an outlying job. A crew that is not spending hours in a truck starts earlier and stays later, which shows up in the schedule.
Truth, trust and transparency is the standard we set for ourselves, and it shows up in how we schedule and communicate.
We run the same sequence on every project: design, site preparation, structure and then finish.
Some homeowners are preparing a house for the next twenty years rather than the next sale. They want durable materials, systems that are easy to service and layouts that will still work as they get older. That kind of planning changes a lot of small decisions.
Some clients own land and want to build on it. Those projects start well before design: where the house sits, how the drive comes in, where utilities will run and how water leaves the site. Getting those right makes the rest of the build simpler.
If you are planning something in Gratis, the first step is a conversation and a set of drawings.

What building here involves
Older homes locally were often built better than their replacements, which is why so much of our work is remodeling rather than tear-down.
Ice damming in January and driving rain in spring are both routine. Both find flashing and underlayment that were not installed correctly.
Ice damming in January and driving rain in spring are both routine.
Permitting and inspection is part of what we handle. Every jurisdiction runs on its own schedule and has preferences about how submissions are assembled. Knowing that ahead of time is the difference between a build that moves and one that waits.
Less driving means more building, and it means we can come back promptly when something needs a second look.
Cedar is a good outdoor wood because it resists rot and insects better than most lumber, but it still needs to stay off the ground and shed water. Post bases, flashing and sealing the cut ends make a big difference in how long it lasts.
Insulation and air sealing are easiest to improve when walls or attics are open. During a remodel or addition, that is the moment to bring the house up to a better standard, because the cost later is much higher.
What we build here

Interior Painting
Walls and trim painted straight
Interior painting where the patching, sanding and priming get done before the color goes on.
Read more
Multi-Structure Estate Construction
Main house, shop, barn, guest quarters
Estates that need more than one building, sequenced so the site work happens once.
Read more
Exterior Remodeling
New skin on a sound house
Siding, trim, windows and entries replaced as one job so the details line up.
Read more
Custom Pool Construction
Pools set into the grade
Excavation, structure and the deck around it handled by one crew, so the site drains correctly.
Read more
Excavation Services
Digging, grading and lot clearing
Site prep, foundation excavation and lot clearing with our own equipment.
Read more
New Kitchen Construction
A new kitchen, planned from the plumbing out
Kitchens built new, in a new house or in a room taken back to the framing, with every system laid out for the room.
Read moreScope, schedule and staying in touch
Our scope document says what is included, what is excluded, what we expect to find once walls are opened, and how a change gets priced. It takes longer to write than a one-page quote and it is why our jobs usually finish where they started.
Expect a stage-by-stage schedule with named risks attached. Late selections and long-lead products cause more slipped dates than anything happening on site.
Expect a stage-by-stage schedule with named risks attached.
There is one point of contact who knows your project, and they are reachable. Most frustration in construction is really a communication failure.
We would rather find the small stuff with you at the end than have you find it alone in month three.
Timing matters more than most people expect. Selections like cabinets, windows, stone and specialty doors can take weeks to arrive. Making those choices early keeps the crew working instead of waiting on a delivery.
Budget is easier to manage when it is set against a real scope. We would rather help you decide what matters most, and spend there, than spread money thinly across everything. A strong envelope and good structure first, then the finishes you will touch every day.
Where Gratis sits
Preble County6 towns
Home ground. Our shop is in Gratis and most of these towns are a short drive.
Building in Preble CountyThe person who walks your property is on site while it is being built.Samuel Hand
What we put in writing
You get a forty-year warranty on standing seam metal or thirty years on dimensional shingles, installed to the standard those terms require.
The manufacturer covers the material; we cover the installation. Anything that is ours to fix, we fix.
Gratis questions
What warranty comes with a standing seam metal roof?
The standing seam metal we install carries a forty-year warranty. Dimensional shingles carry a thirty-year warranty.
Who is actually on site during my build?
Our own crew handles the core work. Samuel is on site through the build, not just at the start and the end.
How do you handle changes once we have started?
Changes get written down, priced and approved before they happen. Nothing gets built off a hallway conversation.
Can you remodel an older home, or only build new?
Both. A good share of our work is remodeling houses that were built well and are worth keeping.
Do you give a written scope before work starts?
Always. It states what is included, what is excluded, what we expect to find once things are opened up, and how a change gets priced and approved. A one-page quote is how disputes start.
Who pulls the permits?
We do, and we deal with inspection scheduling as part of the job. You are not calling a building department.
What happens if you find something unexpected?
We stop, document it, price the options and talk to you before proceeding. On older houses that is a normal part of the process, not an emergency.
Building in Gratis?
If the timeline matters, say so early. Gratis permitting has its own pace.