Start a conversation
Home About
Services Every service
Building Custom Home Builds Luxury Home Builds New Home Construction Custom Home Design Multi-Structure Estate Construction Custom Garages Shop Buildings
Remodeling Whole Home Remodeling Home Renovations Kitchen Remodeling New Kitchen Construction Bathroom Remodeling Custom Tile Bathrooms Home Additions Exterior Remodeling Home Theater Construction
Roofing Standing Seam Metal Roofing Installation Standing Seam Metal Roofing Replacement Dimensional Shingle Roofing
Outdoor Outdoor Living Spaces Outdoor Kitchen Construction Patio Construction Custom Composite Deck Construction Covered Decks Porch Construction Aluminum Railing Installation Custom Pergola Construction Cedar Pavilions Covered Bridges Residential Bridges
Water Custom Pool Construction Hot Tub Installation Water Features Custom Waterfalls
Sitework Retaining Walls Excavation Services Decorative Concrete Stamped Concrete Patios Stamped Concrete Sidewalks Concrete Driveways
Finishes Custom Tile Installation Tile Shower Installation Interior Stonework Stone Veneer Installation Granite Countertops Quartz Countertops Custom Carpentry Custom Woodworking Interior Painting Premium Exterior Painting
Areas Every area
Montgomery County Montgomery County Oakwood Miamisburg West Carrollton Trotwood Englewood Vandalia Clayton Germantown Brookville New Lebanon
Greene County Greene County Beavercreek Xenia Fairborn Bellbrook Yellow Springs Cedarville Jamestown Spring Valley
Warren County Warren County Springboro Lebanon Mason Franklin Monroe Waynesville Carlisle Maineville
Butler County Butler County Hamilton Fairfield West Chester Oxford Middletown Trenton Liberty Township
Preble County Preble County Eaton West Alexandria Lewisburg Gratis Camden West Manchester
Miami County Miami County Troy Piqua Tipp City West Milton Covington Pleasant Hill
Gallery Blog Contact Call · (937) 818-6177
Skip to content
Quartz Countertops

Quartz counters with clean seams

Quartz countertops templated from the finished cabinets, with seam placement and edge profile decided before fabrication.

Building your dream into reality.

Hand Made Enterprises
Scope

What goes into quartz countertops

Quartz is an engineered surface, so the color is consistent from slab to slab and it does not need sealing. What it does need is careful seam planning, because a seam in a solid-color quartz is easy to see.

We template after the cabinets are installed and level, and plan seams away from the sink and the cooktop where we can. Long islands sometimes need a jumbo slab to avoid a seam altogether, and that gets decided early.

We template after the cabinets are installed and level, and plan seams away from the sink and the cooktop where we can.

Quartz handles daily use well but does not like direct high heat, so we plan trivet space and keep it off the outside of the range. Edge profile, backsplash height and cutouts are all settled before fabrication.

Quartz works well for full-height backsplashes and waterfall island ends, where the slab turns down the side of the cabinet. Waterfall edges take precise mitered joints, and the pattern has to be matched across the turn. Those are decided at templating, not on the day of install.

A lot of first calls start with a family that has run out of room. Kids are older, a parent may be moving in, or someone now works from home full time. The question is usually whether to add on, rework the floor plan or start over on a new lot, and the answer depends on the lot, the foundation and how much of the current house is worth keeping.

Timing matters more than most people expect. Selections like cabinets, windows, stone and specialty doors can take weeks to arrive. Making those choices early keeps the crew working instead of waiting on a delivery.

Paint and stain are maintenance items outside, and the prep decides how long they last. Clean, dry, sound surfaces and the right product for the material give the finish a fair chance against Ohio sun and winter.

If that sounds like the way you would want the work done, the next step is a conversation and a walkthrough. We will look at what is there, talk through what you are trying to get to, and tell you honestly whether we are the right company for it.

There is no cost to that conversation and no obligation after it. We would rather spend an hour finding out a project is not a fit than take it on and do a mediocre job.

Process

How this job runs

Walkthrough

We look at the property and the existing conditions before anything else.

Drawings

Plans and a written scope, so everyone is building the same thing.

Build

Our crew runs the work, with Samuel on site through it.

Walk it together

We close the job by walking it with you, not by sending a final bill.

Detail

What actually decides the outcome

Countertops are only as flat as the cabinets under them. Cabinets get set level and secured before anyone templates, because stone will not bend to hide a cabinet that is out of level.

Templating happens on site, after the cabinets are in, so the stone is cut to the room as built. Walls are never perfectly straight and the template captures that.

Templating happens on site, after the cabinets are in, so the stone is cut to the room as built.

Seams, overhangs and cutouts are decided before cutting. Where a seam lands, how far an island overhangs and whether it needs support are choices to make on paper, not on install day.

The rest of the kitchen has to be ready for the stone: sink and faucet chosen, appliances on site or specified, and backsplash plans settled, so the counters go in once.

Truth, trust and transparency. That is the standard, and it shows up in the schedule.
Samuel Hand
More services

Related work

Granite templated, cut and set properly

Granite Countertops

Granite countertops measured off the installed cabinets, with the seams, overhangs and support planned before the slab is cut.

Read more
Kitchen built by Hand Made Enterprises, white galley wood floor

Kitchen Remodeling

Kitchens built around the cook

Cabinet layout, stone, tile and lighting planned together instead of picked one at a time.

Read more
Kitchen built by Hand Made Enterprises, navy island marble

New Kitchen Construction

A new kitchen, planned from the plumbing out

Kitchens built new, in a new house or in a room taken back to the framing, with every system laid out for the room.

Read more
Warranty and coverage

What we put in writing

Forty years on the standing seam metal, thirty on the dimensional shingles. Manufacturer coverage like that is only as good as the installation under it.

Beyond the manufacturer coverage we stand behind our own workmanship. If something we built is not right, we come back. That is easier to say than to honor, which is why we build fewer projects properly rather than more quickly.

Beyond the manufacturer coverage we stand behind our own workmanship.

The service area is Montgomery, Greene, Warren, Butler, Preble and Miami counties, a seventy-mile working radius that we can genuinely cover.

Practically that covers Dayton, Kettering, Centerville, Beavercreek, Springboro, Lebanon, Mason, Hamilton, Fairfield, West Chester, Troy, Piqua, Eaton and the towns between them. Near the edge of that, call and ask.

Common questions

Quartz Countertops questions

Does quartz need sealing?

No. Quartz is non-porous and does not need sealing, which is one reason people choose it for kitchens.

Can quartz handle hot pans?

It is best not to set hot pans directly on quartz. We plan trivet space near the range.

Where will the seams be?

We plan seams at templating and keep them away from the sink and cooktop where possible.

Who is actually on site during my build?

Our own crew handles the core work. Samuel is on site through the build, not just at the start and the end.

How do you handle changes once we have started?

Changes get written down, priced and approved before they happen. Nothing gets built off a hallway conversation.

Can you remodel an older home, or only build new?

Both. A good share of our work is remodeling houses that were built well and are worth keeping.

Do you give a written scope before work starts?

Always. It states what is included, what is excluded, what we expect to find once things are opened up, and how a change gets priced and approved. A one-page quote is how disputes start.

Who pulls the permits?

We do, and we deal with inspection scheduling as part of the job. You are not calling a building department.

What happens if you find something unexpected?

We stop, document it, price the options and talk to you before proceeding. On older houses that is a normal part of the process, not an emergency.

Do you use your own crew or subcontractors?

Our own crew handles the core work. Where a licensed specialty trade is required we bring in people we have worked with for years, and we manage them directly.

Ready to talk about your project?

We build across Montgomery, Greene, Warren, Butler, Preble and Miami counties.